Construction Post 5: The Back-Up Shoot

We decided we had to organise two separate back-up shoots; one for the HQ shots that were to be filmed at the Seward Studio at school, for the low lighting made the film grainy and we were given time to book the studio again for the re shoot. The other shots we had to re shoot involved filming at Alex's bedroom for the hacking shots, giving a point-of-view shot of the hacker putting his hood up from the perspective of the organisation worker working on following the hacker to underneath the Arnos park arches. The train shot gave a greater continuity to the film although it wasn't completely needed for the sequence it just made it look of a higher quality and so we thought it was necessary. As well as a close up of another government conspiracy work reloading his hand gun in order to give more drama to the sequence. The shot of the other conspiracy organisation worker allowed the audience to not be so shocked by the fact they are all there waiting for the hacker later on without any introduction. Overall, the shots we decided on re shooting didn't take much time at all to film, but greatly improved the quality of the film and so it was good to put in the effort and organise filming those back up shots we were lacking beforehand.

A continuity shot we added in the back up shoot.

Construction Post 4: Reflections on Edit Week 1

We created an editing schedule to make sure that we could organise all our free time as a group to maximise the amount of hours we had available to spend on editing for our film sequence and work on it individually and as a group with the free periods we had at school and also in both after school and lunch time sessions that we could stick to.


Adobe Premier Pro editing software

It took an entire day to just go over all of our shots and rename them to make sure they were well organised for when we'd have to use them in our film sequence. However, we then had four days to simply trim these clips that we had ordered into the coherent structure we wanted and trimming them down to make sure to keep the film fast paced and keeping the narrative continuous. The editing of the continuity in the running sequence consumed a lot of time, as we had to edit frame by frame in order to bring a good level of continuity to the actions of the runners involved in order to create the best continuity towards the position of their feet and arms and distance between each other, which took a lot of time to edit to a good level.

When discussing the film with our target audience it was clear that the music had to be changed, so that the opening sequence was more dramatic. Our group decided that the music that we had from the test shoot wasn't good enough due to the fact that it didn't have the dramatic, fast paced nature that would suit the action-thriller genre. I searched through the YouTube audio music library that was recommended by a boy in year 13 and narrowed down the search for the right track into three songs and showed them to my other group members. We all agreed that 'the drive' track was the best for the dramatic action vibe that would suit the film sequence well.

Construction Post 3: Reflections on our Main Shoot Session


All of the actors turned up for the filming on time, where we were able to take many high quality shots building up from the things we learnt worked and didn't work in our test shoot. All seven actors worked well and listened to our advice that we gave them on how to act on camera in order to bring the best out of them on camera. The process was definitely not as stressful as I thought it would be and our prior experience from the test shoot made us more familiar on how to use the camera equipment and control the actors on set with a strong idea on what exactly we were to be filming. We knew the blocking of the characters on film and the precise spot of where the camera should be placed as well as the lighting we were going to have.

Running shot in test shoot
Running shot carried over in main shoot

The majority of our shots we didn't have to re-shoot, but some of them we did. Our target audience were keen on us keeping with the quick nature of our running shots, so we decided to keep the quick pace of the running shots for those shots underneath the bridge. The shots of the hacker at Alex's room we decided to re-do, for it didn't look as slick as we wanted and the hacking detailing on his screen didn't look as complicated as we wanted it to be. This also meant we had to re shoot the HQ shots with Jerom and I acting in it, for there are shots of the hacker's computer screen on the organisation's computer due to them tracking him down. We would have already had to re shoot the HQ shots anyway, because the low lighting of the Seward Studio we chose made our footage look too grainy and so we had to re shoot at school on the Tuesday after school the week after filming our main shoot.

Construction Post 2: Our Post-production Kit

We were able to edit on The Latymer School's edit suites and were giving Macbooks for creating the the titles using the 'Live-type' program. Our Post-production kit comprised of:

  1. Adobe Premier Pro CS5.5 
  2. Dual-monitor edit suite running Windows 7
  3. A Macbook
  4. Live-type running on the Macbook to create titles
Live-type on a Macbook

Construction Post 1: Our Production

The media department gave us the equipment we would need and we signed contracts to ensure the equipment was kept safe during the filming of our sequence. The kit comprised of:


How the kit was set up on set
  1. Canon Legria HFG30
  2. Libec TH65-DV Tripod
  3. Canon DM-100 Shotgun Microphone
  4. Sennheiser HD 201 Headphones
  5. Clapperboard

R+P Post 20: Reflections so far / looking ahead

Our research into the Mr. Robot TV series went well, as it gave us much inspiration to how to film the sequence and what characters should wear and the general edgy vibe to go for. We were also able to use the shoot board in order to create our efficient shot list.

Despite the fact there were mistakes in our rough cut, we could also see the multiple shots that we wanted to include in our main shoot and we were able to talk to the teachers as well and come up with good conclusions on what to change when it came to filming our main shoot. The shoot allowed us to speed up our timing when organising our main shoot as we would know exactly how to set up when we were to reach our different sets at the stations, the park, etc.

R+P Post 19: Our rough cut

Once our test shoot was finished we edited the footage into our rough cut and it was a useful tool to see how our entire sequence would look together with sound effects and so we could perfectly see whether the sequence appealed to the audience we wanted it to appeal to and whether it was fast paced for the action-thriller genre as well as being continuous from start to finish.

On seeing the film we could see that the shots were too long for the fast paced nature of the action-thriller genre and our music also seemed quite dull and didn't have the dramatic affect we needed to grab the audiences attention. There were some continuity errors as well, e.g. the close up of the hacker dragging the mouse the wrong direction to delete the file he had hacked from the computer by putting it in the trash.

The continuity shots jumped too much from the people watching and following the hacker on his journey and the CCTV shots weren't convincing enough. However, many of the other shots did work well for the genre we were trying to connote, as a tense atmosphere was easily created.